PC15 NI Water Civil Engineering Framework – East Belfast Lead Pipe

NI Water has a 25 year programme to improve water quality by identifying and replacing lead pipes within its infrastructure. The Lead Pipe Replacement (LPR) projects are street by street upgrade of individual premises water supply pipe typically in areas of previous high density communication pipes. Nu Line Utilities are a resident contractor year PC15 Framework working with NI Water to replace an average of 1200 lead service pipes per annum.

Aughnagun Drought Mitigation

The prolonged drought conditions of summer 2018 necessitated rapid mobilisation works to facilitate treated water supply to the Aughnagun Command Reservoir in South Down. Working on collaboration with the NI Water Project Management and Newry Networks Teams Nu Line Utilities worked around the clock to deliver the bulk water transfer, pressure, flow and inlet control system upgrades adapting the existing supply infrastructure to the Mayobridge facility.