Irish Water / Meath County Council – Bellewstown WTP Rationalisation

As a resident contractor on the Irish Water Civil Engineering Framework, Leinster Region Nuline Utilities as part of the Nuline Coras Joint Venture with Coras Pipeline Services were appointed as Design, Build & Operate(DBO) Contractor on the £400K Bellewstown Water Treatment Plant Rationalisation Project in early 2018.

The works involved the installation of approximately 2.3km of new rising main between Carnes Reservoir and Woodview Housing Estate in Bellewstown, construction of a new duty standby booster pumping station at the Reservoir, installation of telemetry, chlorine dosing and analysing, flow control and measurement, pressure monitoring and measurement plant and equipment. The watermain tied in to an existing outlet main from the reservoir at its western end to the existing distribution network within Woodview Housing estate at its eastern end. Works include operation of the new supply system in conjunction with maintaining the current (original) borehole supply system with ultimate demolition and decommissioning of the existing treatment facility. Working closely with our delivery partners Cully Automation, Campion Pumps and Byrne Looby Designers works were delivered ahead of budget and schedule in 2018 with operation continuing in 2019.